CATHETER COATING MACHINE APPLICATION PLANNING CHECKLIST SAVASTO — 12 November 2026 Use this worksheet to prepare an application discussion. It is not a released specification or proof of equipment capability. Do not include patient data, passwords, controlled drawings or confidential technical information without arranging a suitable exchange. PROJECT Company: Contact: Project stage and target timing: WORKPIECE AND PROCESS 1. What catheter lengths, geometries and loading arrangements apply? Notes: 2. Which coating chemistry and pretreatment are specified? Notes: 3. What immersion, withdrawal and curing parameters are needed? Notes: 4. How will coating quality and process acceptance be evaluated? Notes: TECHNICAL SCOPE Process technology Platform approach: Catheter dip coating and UV curing Application input: Specify the coating system, pretreatment and required finished surface. Your requirements: Workpiece presentation Platform approach: Manual loading with controlled vertical movement Application input: Confirm catheter length, geometry, fixtures and loading arrangement. Your requirements: Curing stage Platform approach: Integrated UV chamber Application input: Define chemistry-specific exposure conditions and the method used to verify cure. Your requirements: Operator control Platform approach: Touchscreen setup and stored process programs Application input: Agree the sequence, parameters and process records for the proposed application. Your requirements: Platform format Platform approach: Vertical floor-standing machine Application input: Confirm installation dimensions, service access, ventilation and utilities. Your requirements: ACCEPTANCE AND HANDOVER Chemistry and preparation: Identify the coating supplier’s process requirements and the condition of the surface before coating. Agreed responsibility / requirement: Coverage and surface: Agree coating coverage, visual condition and any dimensional or surface checks. Agreed responsibility / requirement: Coating performance: Define adhesion, lubricity, durability or other application tests and who performs them. Agreed responsibility / requirement: Handover: Agree solution handling, fixture identification, recipe records, operating instructions and maintenance scope. Agreed responsibility / requirement: NEXT STEP Discuss the application with SAVASTO at sales@savasto.com. Exact configuration, utilities, capacity, performance and deliverables must be confirmed for the proposed machine.